Journal of Nuclear Fuel Cycle and Waste Technology 2015;13(2):163-169. Published online: Jun, 30, 2015
DOI : dx.doi.org/10.7733/jnfcwt.2015.13.2.163
In many nuclear power plant sites in Korea, high density storage racks were installed in the spent fuel pool to expand the spent fuel storage capacity. Nevertheless, the capability of the Hanbit nuclear site will be saturated by 2024. Also, 10 NPPs will reach their design life expiration date by 2029. In the case of the US, SFPI (Spent Fuel Pool Island) operated temporarily as a spent fuel storage option before spent nuclear fuels were transported to an interim storage facility or a final disposal facility. As a spent fuel storage option after shutdown during decommissioning, the SFPI concept can be expected to have the following effects: reduced occupational exposure, lower cost of operation, strengthened safety, and so on. This paper presents a case study associated with the regulations, operating experiences, and systems of SFPI in the US. In conclusion, the following steps are recommended for applying SFPI during decommissioning in Korea: confirmation of design change scope of SFPI and expected final cost, the submission of a decommissioning plan which is reflected in SFPI improvement plans, safety assessment using PSR, application of an operating license change for design change, regulatory body review and approval, design change, inspection by the regulatory body, education and commissioning for SFPI, SFPI operation and periodic inspection, and dismantling of SFPI.
Keywords
Spent Fuel Pool Islanding,Decommissioning,Regulatory Framework,Spent Fuel Management